SUMITOMO CON. CO., LTD.
KILIFI BRIDGE PROJECT KENYA |
JULY 1988 - 1990 |
PROVIDE 70 UNIT EQUIPMENT
INCL. 400TON CRANE I 6.000DWT WORK BARGE MOB/DEMOB SlNGAPORE/KENYA |
TAISEI CORP./KAMIGUMI
MALDIVE BREAKWATER PROJECT MALDIVE |
JULY 1988- APR 2002 |
MARINE TRANSPORTATION OF CONSTRUCTION MATERIALS SAND, GRANITE, CEMENT AND PROJECT CARGOS
TOTAL 550.000 FIT |
OBAYASHI-TOYO JV
SENTOSA LINK ROAD PROJECT
SINGAPORE |
AUG 1990 - DEC 1992 |
PROVIDE 1OOTON I 150TON CRANE BARGE AND 6.000DWT FLOATING DOCK |
OBAYASHI/NIPPON STEEL YOKOKOWA JV/SUMIKIN TRANSPORT CHROY CHANGWAR BRIDGE PROJECT
CAMBODIA |
DEC 1992- DEC 1993 |
MARINE TRANSPORTATION OF BRIDGES FM JAPAN TO PHNOM PENH CAMBODIA AND INSTALLATION OF BRIDGE
STRUTURES AT SITE. PROVIDE TUGS AND
1.000TON FLOATING CRANES ETC. |
SHIMIZU CORPORATION TOYO CONSTRUCTION SUMITOMO CONSTRUCTION
2ND LINK BRIDGE PROJECT
SINGAPORE, MALAYSIA |
MAR 1995- DEC 1997 |
PROVIDE ( 2) UNIT FLOATING DOCKS; ( 30) UNIT CRANE BARGES/ANCHOR BOAT ETC.; (2) UNIT CRANES
INCL. MOB/DEMOB WORKS |
SUMIKIN TRANSPORT KUMAGAI/MAEDN/HITACHI YOKOGAWA J.V. KAP SHUI MUN BRIDGE CONSTRUCTION HONG KONG |
MAY 1995- APR 1996 |
PROVIDE 2.000DWT BALLAST BARGE INCL. MOB/DEMOB |
DAIHO CORP.
PALAU FLOATING BRIDGE PROJECT PALAU |
MAR 1997- JULY 1997 |
MANUFACTURING OF 108 PCS X 35TON CONCRETE SINKERS (TOTAL 3.780 TON)
MARINE TRANSPORTATION FROM BATAM INDONESIA TO PALAU
INSTALLATION OF CONCRETE SINKERS AND STEEL BRIDGES |
PT. TAIYO SINAR/SUMITOMO CHEMICAL GRESIK P.V. C. PROJECT
SURABAYA, INDONESIA |
MAY 1997- AUG 1997 |
PROVIDE (4) UNITS CRANES
MARINE TRANSPORTATION OF MATERIALS/EQUIPMENT |
PENTA-WAKACHIKU J.V.
COLOMBO CONTAINER PORT PROJECT SRI LANKA |
JUNE 2000 - MAR 2003 |
PROVIDE ( 2 ) UNIT 150TON CRANE BARGE
INSTALLATION OF (9) UNIT 1500TON CONCRETE CAISSON BY FLOATING CRANE
INCL. MOB/DEMOB |
PENTA OCEAN- MITSUBISHI J.V.
BOURGASPORTPROJECT BULGARIA |
FEB 2003- DEC 2004 |
PROVIDE (2) UNIT 600DWT BARGES INCL. MOBILIZATION TO BULGARIA |
PENTA OCEAN CON. CO., LTD.
KEPPEL HARBOUR RE-DEVELOPMENT BRIDGE PROJECT
SINGAPORE |
JULY 2006- JUNE 2007 |
PROVIDE 150TON CRANE BARGE ETC
CONCRETE BLOCK (MAX.600TONS) INSTALLATION BY FLOATING CRANE |
DAIHO CORPORATION
PORT OF EHOALA PROJECT MADAGASCAR |
OCT 2006- SEPT 2009 |
PROVIDE
( 8 ) UNIT MARINE EQUIPMENT
( 3) UNIT 280TON CRAWLER CRANE (40) UNIT MACHINERIES
(30) OPERATORS/MECHANICS
INCL. MOBILIZATION I DMOBILIZATION |